Ctrl + F is the shortcut in your browser or operating system that allows you to find words or questions quickly.
Ctrl + Tab to move to the next tab to the right and Ctrl + Shift + Tab to move to the next tab to the left.
On a phone or tablet, tap the menu icon in the upper-right corner of the window; Select "Find in Page" to search a question.
Share UsSharing is Caring
It's the biggest motivation to help us to make the site better by sharing this to your friends or classmates.
The planning, design, and implementation of infrastructure and utilizing various materials and techniques to create functional and aesthetically structures.
Who designed the Vietnam Veterans Memorial in Washington, DC?
Choose the correct word for the following sentence.The foundation for a skyscraper building must be deep/shallow.
Which among from the choices below is a type of a power sander?
The type of soil most likely to result in a trenchcave-in is...
Identify this
Nowadays in modern construction the application of plastering is reduced and replaced by various types of dry lining on interior surfaces and cladding on exterior surfaces.
An octagon has eight sides
Which of the following is not a PERT event?
Gypsum is a common mineral available as calcium sulphate dehydrate _____________ in the nature
Determine critical path of the network shown in fig.
What round megalithic monument stands on England's Salisbury Plain?
What is the first step involved in structural design?
What term describes a structure built against a wall to support or reinforce it?
The area under the Beta distribution curve is divided into two equal parts by
Label this picture.
Identify the tool below:
How many sides does a Quadrilateral have?
A sign with BLACK writing/drawings and a YELLOW background is a
Which Problem below arising in plastering
What French term describes a decorative painting intended to appear real?
_____________ can be defined as the process of covering rough surfaces with thin coat of plastic material to form a smooth durable and jointless surface
Identify the type of symbol stated below:__ __ __ __ __ __ __ __ __
WHICH TYPE OF GYPSUM PILASTER Usual setting time is 2-3 hours
Suggest 2 waste prevention strategies in design stage to promote construction sustainability?
A technique by which associating the description with something else or something familiar.
Label the image of number 4.
What lines in a plane do not intersect or touch each other?
The time by which a particular activity can be delayed without affecting the preceding and succeeding activities is known as
Generally a mix proportion of 1 volume cement to 6 or 7 volume of sand is used
Complete the sentence below with the correct words.Finally, _____ paint the walls and ceilings of the building.
Label this picture.
One of these give support to a room in a construction.
The usual thickness of finishing coat is 5-7 mm
The coating of plastic material is termed as "plaster"
Interfering float is the difference between
One of these is a natural material
Choose the correct word for the following sentence.A spread footing/caisson piers is/are used when the soil is weak.
What wall, built in the 2nd century B.C., marked the northern limit of the Roman Empire in England?
Which class of gypsum pilaster that an accelerator is added to improve the setting time
Determine Critical path.
The person primarily responsible for your safety is....
The advantages of Gypsum is that it expands slightly on setting and drying prevents cracking
Before the year of completion, under the percentage of completion method, the year-end balance of the Construction in Progress account equal to:
A technique of thinking about how could you make the situation worst to improve it.
One of this is used for binding
............ refers to different particles mixed
Finishes form the interface between building users and the building and hence affect the way in which we interact and perceive our built environment.
The SDS for any chemical used at a job site must be available...
Choose the correct word for the following sentence.A flat roof is usually covered in roofing felt/skin for protection against the weather.
Which of the choices below does not belong to the basic criteria of a good design?
This is the accounting framework/standard that deals with the long-term construction contracts.
LoveKo Incorporated has consistently used the percentage-of-completion method of accounting for their contracts. In 2020, LoveKo started work on a 9,000,000 fixed-price construction contract that was completed in 2021. The company's accounting records disclosed the following:cumulative contract costs incurred (2020) 3,900,000cumulative contract costs incurred (2021) 6,300,000estimated total costs at completion (2020) 7,800,000estimated total costs at completion (2021) 8,100,000How much gross profit would LoveKo have recognized on this contract for the year 2021?
Choose the correct word for the following sentence.Rooms in a building are divided by interior support/partitions.
It is a logical approach in which the problem is split up into a minute sub problems until the whole problem has become a network of interrelated problems.
A symbolic line described as a fine line terminated with arrowhead or end mark pointing to a part or spot?
These are thin lines spaced evenly resembling a shaded effect. This is used to indicate cut-off portion of parts in section.
Which class of gypsum pilaster sets in 5-10 minutes by regaining the lost molecular water
Updating may result in
Which is not a part of a production document?
Undercoat mixes should be sufficiently strong to obtain a good key but should not be stronger than background
What German architect founded the Bauhaus school of design?
What is the full form of MCB
Complete the sentence below with the correct words.During building, _____ construct the roof.
Calculate total time required and critical path?
Signs with GREEN writing/drawings with a WHITE background is for
What is the name?
If the Background will not completely dry before the undercoats are applied which type of problems rising
It involves the development of ideas, concept or alternative solutions to the problem
A tool that is used for marking and measuring. The distance is set from the point to the guide with a rule.
Label this picture.
BabyLove Company has consistently used the POC method. On January 12, 2020, BabyLove began work on a 6,000,000-construction contract. At the beginning of the contract, the estimated cost of construction was 4,500,000.The following data relate to the progress of the contract:Income recognized at December 31, 2020 600,000Cost incurred from Jan. 12, 2020 thru Dec. 31, 2021 3,600,000Estimated cost to complete at Dec. 31, 2021 1,200,000How much gross profit should BabyLove recognize for the year ended December 31, 2021?
All the sides of scalene triangle are equal.
Internal plasters shall be 20 mm.
Sand should be clean and free from clay when we use it with gypsum
An angle whose measure is exactly 90 degrees.
What site, also called Hearst Castle, was built in the 20th century for William Randolph Hearst?
Look at the sides of this triangle. What type of triangle is this?
The technique in which the creative process as a subconscious activity of the mind is being stimulated, combining different seemingly unrelated elements?
In Plumbing Drawings what does IC mean?
The gigantic palace complex in Beijing built during the 15th century is known by what name?
A ten-sided polygon is called decagon.
Choose the correct word for the following sentence.Sound- deadening/barrier materials are used to reduce sound passing from one room to another.
Which of the following is a weakness of bar chart?
In computing the percentage of completion ratio, under the cost-to-cost method, actual costs incurred should exclude:
Data cable and electrical cables can be run adjacent to each other? True or false
What type of quadrilateral is this?
Gypsum pilaster class D should be mixed with lime
Which statement is NOT true?
Image: https://quizizz.com/media/resource/gs/quizizz-media/quizzes/e9197a4a-aee5-491b-882a-aaf28e17e675?w=200&h=200
Which of the following does not belong to the group?
Which of the following issues can be minimized through the implementation of green building?You may choose more than one if applicable.
A circle is a polygon.
BebeTime Construction has consistently used the percentage-of-completion method of recognizing income. In 2021, BebeTime started work on a P3,000,000 fixed-price construction contract. The accounting records disclosed the following data for the year ended December 2021:Costs incurred 930,000Estimated cost to complete 2,170,000Progress billings 1,100,000Collections 700,000How much loss should BebeTime have recognized in 2021?
How do I get my project built?The above question is refered to the one of the principle of sustainable construction which is ________________.
A name for large wood in construction is....
What is the tagalog term for the image below? (used for making wood surfaces smooth & flat)
..What kind of triangle is this?
A dummy activity
Which of these activities is most likely to produce flying ofbjects?
Which of these are considered PPE?
Critical path is
Complete the sentence below with the correct words.When building a house, the _____ first of all examine the site and makes a plan of the size and shape of the plot of land.
Before the year of completion, under the zero-profit method, the year-end balance of the Construction in Progress account is equal to:
This tool is used for fitting joints in wood and for shaping edges
Because of some specifications posed by the customer that a contractor cannot perform, the process of __________ is usually being entered into.
Why contingency reserves are provided ?
Positioning lanyards are used only as fall restraint devices and may not be used as fall arrest devices.
In what country are the Petronas Towers?
Which type of the structure WBS is ?
Slack time refers to
Concrete is a mixture of several components.
What is the general height of the switch board
Choose the correct word for the following sentence.To prevent water from entering the wall cavity, moisture barriers are used on the external surface, and vapour/insulating barriers are used on the internal face.
Which of the following does not represent an activity?
Spattering of a cement/ sand slurry dash coat increases the bond
Complete the sentence below with the correct words.A _____ calculates exactly how much of these materials will be needed for the building.
Materials give off scent and this too will influence our internal environment and may affect our health.
This symbolic line is used to show that part of the object is imaginarily cut-off so that the section or the inside part could be shown?
In the nature of work process, what comes next after studying the design problem?
Complete the sentence below with the correct words.There are two main methods of building houses. In one, solid walls known as _____ walls are constructed.
In PERT analysis, the time estimates of activities and probability of their occurrence follow
What Wisconsin-born architect designed Taliesin and the Guggenheim Museum?
The tool that used to cut curves and straight lines in thin as well as in thick stock.
Choose the correct word for the following sentence.The ventilating/acoustical system provides fresh air.
Complete the sentence below with the correct words.During building, _____ cut and placed stones.
It is to make something out of nothing?
_________________ is the capability of a design to be constructed. It is one of a project management technique for reviewing construction processes from start to finish during the design and pre-construction phase to identify potential obstacles before a project is actually built to reduce or prevent error, delays, cost overruns, wastages etc.
Complete the sentence below with the correct words.Next, an _____ makes a detailed drawing of the building and gives information about the materials which are to be used.
In a bed room with attached toilet which is the ideal position to place a switch board?
It is important that the aggregate shouldn't be clean
Stone is not considered a natural material.
What clay/straw bricks are common in construction in the Southwestern United States?
Application of materials to existing backgrounds, such as plaster to a wall or paint to timber, is an inherent finish
This tool is specialized in cutting shape edges, moldings, picture frame stocks, etc.
Complete the sentence below with the correct words.Once the building has been completed, _____ lay meters of electrical cable.
Name it
When something is flammable, it is
A scaffold is defined as
What does cradle to cradle refer to construction project?
A polygon with nine sides
What U.S. building was the tallest in the world from 1974 through 1998?
A sign with BLACK&WHITE writing with WHITE< BLACK, and RED background is a
The excess of the Construction in Progress account over the Contract Billings is treated as:
It is an artificial material
What type of rule is this?
Functional requirements for materials to use in internal finshings
Vageta's friend's son's daughter name is
The difference between the time avail-to do a job and the time required to do the job, is known as
What slender structure topped by a revolving restaurant was built for the Seattle 1962 World's Fair?
With reference to Electrical Layout what is a DB
What St. Louis structure is the tallest manmade U.S. memorial and was built in the 1960's?
A slab used to take pipelines below the toilets in upper floor levels is called as
Complete the sentence below with the correct words.During building, _____ cover walls and ceilings with plaster.
Which class of gypsum pilaster The usual setting time is in the range of 1-1.5 hours
This tool is used by the wagon maker for shaping pokes for wooden wheel.
What are the elements that could be modify in value engineering? *Not limited to one elementHint: you need to watch a video linked in the lecture slide.
Label this picture.
THE class B of gypsum pilaster is not suitable on plasterboards or any other soft background
A continuous development of small changes that is applied to the previous design to make the piece more interesting?
What New York City building is intended to be 1,776 feet tall at its completion?
This tool is also called a scroll saw.
In a normal staircase both the waist slab and steps are done in concrete.
Economic saving of time results by crashing
Ground is defined as
Functional requirements for materials to use in external finshings
Two lines that intersect and form a right angles are called_________.
What building was the first to have more than 100 floors?
Most plasterboards have one surface ivory and the other gray colored paper Only ivory color surface is suitable for the application of board plasters The other surface is ready for direct decoration
Sand used in the plaster mixes can be obtained from the rivers, from the sea or by crushing stones.
What is the 4th step in using Morphology?
A sign with BLUE writings/drawings is an
What architect created the concept of the geodesic dome?
Carefully chosen, materials with an inherent finish may help to reduce construction time and initial construction costs
Element of sustainable design includes:
Provide ONE benefit of Building Information Medelling (BIM) application towards construction sustainability?
Critical path method
Which of the following is IMPORTANT in the concept of lean construction?
How many sides does a heptagon have?
What bridge, built in the late 19th century, was the last bridge designed by John Roebling?
The main binding agent in "Rendering" is portland lime
The primary function of a surface finish is to provide a durable, visually attractive and low maintenance surface to floors, walls and ceilings.
What does Soil Pipe Carry out from the toilet?
The rapid evaporation of water from the surface cause irregular surface cracks known as____________
All admixtures should be free from dirt and chemicals harmful to the mortar
Whenever an activity has zero total float, then
What does NGL mean in an Section drawing?
Label the image of number 3.
Choose the correct word for the following sentence.The assembly/structure of a building transfers all the loads acting on the building to the ground.
The process of incorporating changes and rescheduling is called
If this drawing is a Plan, What does this represent?
Total float for any activity is defined as the difference between
A barrier with yellow and purple markings indicates a...
Complete the sentence below with the correct words.During building, _____ make the wooden structure.
Mortar mixes should be made stronger than the background and finishing coat should be stronger than the undercoat
Name this quadrilateral.
Lime pilaster has the ability of absorbing humidity in the air giving better comfort to the occupants
When positioning a straight ladder against a wall, how far from thewall should the base of the ladder be?
Complete the sentence below with the correct words.Then, the ground is dug out, and _____ are laid.
What was the intended purpose of the spire at the top of the Empire State Building?
What is the primary purpose of design?
OSHA means
What kind of quadrilateral is this?
The durability of the finish will depend upon the material properties of the finish and the material it is applied to, as well as the bond between the two materials
What octagonal building in Jerusalem was the first major Islamic monument?
What is the creative action that fulfills a purpose that should be deliberate and intentional?
....What is the name of this kind of triangle?
What temple complex, built in the 12th century in what is now Cambodia, honors the Hindu god Vishnu?
Whether Percentage of Completion or Zero-profit Method is used, it will ALWAYS result to the same total gross profit.
Revenue is recognized each year in both methods (Percentage of Completion and Zero-profit Method).
What is the name of your high school?
If a scaffold has a yellow tagit means...
Fewer landfills, greater markets for environmentally preferable products, decrease traffic due to the use of local materialsImproved occupants productivity, satisfaction, health and safetyImproved comfort conditions for occupants, reduce adverse health impacts, improved occupant comfort and satisfaction, better individual productivityWhich pillar of sustainable refered to the above benefits of sustainable design?
To prevent cracking natural or synthetic fibers are used in lime pilaster
The process of which the different concepts and new ideas are analyzed and tested.
What structure did Shah Jahan build at Agra in the 17th century as a tomb for his wife?
Many materials such as timber, stone, brick and glass provide a natural finish without any need for further work is an _______________________
What type of tool that is used to make bowls, lamps and table legs?
identify the detail is shown in the picture
A rectangle can also be called a...
Portland Cement or other types of cements are used as binder in plaster mortars
By dry lining insulation and fire resistance values of a wall can be improved by incorporating suitable materials
The first method invented for planning projects, was
What is full form of HVAC?
A cathedral in France with what name was briefly the world's tallest building in the late 1800's?
What Presidential monument in Washington, DC is in the shape of an obelisk?
What country gave the Statue of Liberty to the United States?
Label this picture.
A six-sided polygon
Under the zero-profit method, ______ should not be recognized until the final year or year of completion.
Which one is not the component of Construction planning ?
Lime plaster hardens fastly
Complete the sentence below with the correct words.Once the building has been completed, _____ install pipes for heating and water.
The plaster mixes and application techniques on outside surface should be same in interior application
LoveKaBa Company began a construction project on a building for 3,000,000. The project was completed during 2021. The accounting records disclosed the following:Progress billings during the year (2020) 1,100,000Progress billings during the year (2021) 1,900,000Cost incurred during the year (2020) 900,000Cost incurred during the year (2021) 1,800,000Estimated cost to complete (2020) 1,800,000What is the balance of construction in progress account at the end of 2020 under the percentage of completion method?
When a lockout is performed, the key to the lock is...
To keep up this site, we need your assistance. A little gift will help us alot.
Donate- The more you give the more you receive.
Related SubjectIgloo Architecture
Mathematics in the Modern World
General Chemistry Organic
Screenwriting
Cybertruck Technology
Pantone's 2025 Color of the Year
Huawei Smartphone Innovation
The Freedom Factory: Innovation
Candy Crush Soda Saga: Design and Strategy
BMW M3 Performance and Engineering
The Evolution of the Dress
Honda CRX History and Legacy
Revolutionary Wooden Satellite
Apple M4 Macs
Boeing: A Century of Aerospace Excellence
Software Development
Kitchen and Bath Specialty
Engineering
Fashion Design
Fashion Graphic Arts
Electronics Engineering Technology
Desktop Publishing
Computer-Aided Design
Architectural Studies
Art and Design
Web Enhanced Animation Graphics
System Analysis Design and Development
Management Information Systems
Software Engineering 2
Modeling and Simulation
Computer Aided Drawing
The Rebirth of Notre Dame
The Ancient History of Sunlight
French
Fine Arts
Mobile Application Design and Development
Art Appreciation
New Glenn Rocket's First Orbital Flight
SpaceX Moon Landers
The Importance of STEM Education
The Science of SpaceX Satellites
Elon Musk: Innovator and Visionary
Environmental Science
Chemistry for Engineers
Texas Border Wall
Managing Information and Technology
Southern California Wildfire Risks and Winds
Red Dye Ban in Food and Medicine
Severe Weather and Travel Delays
Azerbaijan Airlines Crash in Kazakhstan
Avalanche Studies
Salmonella Risks in Food Safety
The Rise in Drug Overdose Deaths
Tropical Cyclone 18: What to Expect as Rafael Approaches the First Coast
Welding Technology
Phlebotomy
Health Education
Family Child Care
Before and After School Care
Certified Nursing Assistant
Risk Management Applied to Safety Security and Sanitation
Quality Assurance Testing
Procurement
Food Service Management
Project Management
Germany Energy Policy
How Wildlife Images Rehabilitation Operates
Interior Design
Environmental Science: Biology
Science Technology and Society
Shopee Cashback Voucher
Temu $0 Shipping Fee
Amazon 75% Off Discounts