Involves managing and optimizing inventory levels, production schedules, and resources to ensure smooth operations and meet customer demands efficiently.
Installed capacity :-
Ordering the optimum quantity of an item based on historical data is known as:
In assignment matrix, it is a must to determine Jacobean of the determinant.
Classification of items on basis of their capital lock up is called ________ analysis.
The earliest start time of an activity equals to earliest event time of :-
Reorder level determines how low inventory should be before reordering occurs.
Rational figure on utilization index can be obtained by carrying out ________ study.
The queue time is intended to compensate for the time for which the job has to :-
Computerisation of line balancing involve following requirements :-
Demand distribution systems are :
Detachable Card contain following information :-
Total lead time is the summation of following factors :-
Detachable ticket, after filling in required information is :-
If the annual usage of a material is 1200 units and the reorder point is at 120 Units, find the lead time.
The computerized locked supply system is a variation of the :
If set up time for four operations involved is 2 ,1.5, 2 , 2.5 hours respectively, total set up time would be 10 hours.
________ inventories help to balance company's supply with market demand.
Physical Count method of collecting information from manufacturing shops is applicable in following situation :-
The light engineering company has one special purpose facing ¢ering machine And one copying lathe. The foreman has five workorders for processing . The operation Sequence is fixed [ each job isfirst faced and centered and then copy turned ] . The standard Hoursrequired for each machine to process each work order are shown in thefollowing Table :- Work Order Processing Time [Hours ] Facing ¢ering machine Copying Lathe I 16 40 II 30 60 III 20 6 IV 15 16 V 2512 find sequence to minimize requirements of machine hours.
The make-or-buy decision is not taken only at starting of a factory but has to be reviewed continuously.
When shop floor scheduling problem larger than 3 machines arise theanalytical solution procedures leading to optimality are complex anddifficult.
Following difficulties are faced by SDE analysis :-
Production Planning and Control makes the supervisor ineffective.
Transportation carts should be claned at least
Which distribution system requires the using department to be responsible for maintaining inventory levels?
Total inventory cost =
The most efficient distribution system is the:
In alternate routing, the delayed job may be routed to a ________ machine where rate of production is faster.
The commonly used network techniques other than PERT and CPM are as follows :-
Annual Ordering cost is inversely related to the order quantity.
Flexibility and product variety are not inter-related with each other.
Finished goods inventory is the amount of manufactured product in stock that is available for sale.
The following are salient features of the fixed order quantity system :-
Process Sheet contains following information :-
What is the shape of the inventory usage when all EOQ assumptions are met?
On completion of work the job card is returned to production planning and control department for reference and record.
Work measurement is not useful for choosing between two alternate methods of production.
Fluctuation due to changes in season are called cyclical fluctuation.
Development of additional vendors/suppliers depends upon :-
The 'G' group of GOLF analysis covers items procurement from Government suppliers such as :-
If Kwh consumption per 100 pieces is 8.01 and cost/kwh is Rs 0.80 thecost of power over the year for 40000 pieces with 2000 numbersrejection would be Rs ________.
Stock of finished goods are based on :-
They are type of analytical estimate :-
Labour efficiency factor is applied after capacity requirement of equipment is calculated.
Lead time is ________ for different items.
One of the causes of inability to meet delivery date originally promised :-
PERT uses linear programming and probability concepts for planning and controlling activities.
The make-or-buy decision becomes necessary when the current source ofsupply is not able to supply the material in accordance with buyer'squality requirements.
CONCLUSION CHAPTER 7?
Important considerations in scheduling are :-
In linear programming method of line balancing, there are three types of constraints namely :-
The overall objective of inventory management is to achieve satisfactory levels of customer service while keeping inventory costs reasonable.
LOB technique was devised by US army in the year :-
Effective capacity per period is calculated as :-
Keeping procurement cost and carrying cost constant, if annual usage of certain product becomes 4 times, the EOQ would be :-
The purchase-order lead time is the ________.
Par levels should be based on:
The assembly work content [ Wi ] of the i'th station having n work stations is given by :- Correct Answer
Short term forecasts are for ________.
To solve "n jobs - 2 machines" sequencing problem, it is assumed thateach machine can perform only one type of operation and can undertakeonly one job at a time.
Orders with ________ slack time remaining per operation are run first.
WHAT A COUNT TO USED BY FOODSERVICE?
Steps involved in process planning include the following :-
The Heuristics approach has a base of binary number theory.
The expected time can be minimised by minimising following parameters :-
How much Portion of a given menu item
XYZ analysis helps to identify few items which account for large amountof money locked up in the stock and take steps for liquidation /reduction.
A firm has 6 jobs to be processed on three machines A,B and C in theorder ABC. The processing time of each job is given in the tablebelow:- Find the idle time on different machines . Job Processing time[ hours ] Machine A Machine B Machine C J1 25 16 20 J2 26 20 19 J3 2417 18 J4 22 20 21 J5 24 21 17 J6 28 18 13
To solve "n jobs - 3 machines" sequencing problem, the largest of timeof any job on the second machine must be smaller than or equal to thesmallest time of any job on first machine or third machine.
An ongoing inventory management system is known as a:
There are five manufacturing systems. However, many manufacturers combines two or more systems to produce a final product.
Due to the following emergent events, the queue time has to compensatefor the time for which the job has to undergo an extra time :-
Find EOQ in Rs from the following data :-Annual consumption = 20, 000units, Ordering and receiving cost of material = Rs 20 per order,Annual carrying cost or storage cost = 10% of unit cost of material,Cost of material = Rs 50.
A progress card normally contains ________ squares.
Identify the costs and risks of OVERstocking:
The maximum order level is:
________ is a production line made up of operations that form or changethe physical or sometimes chemical characteristics of a product.
5 jobs are to be processed on machines M1 and M2 , first on M1 and thenon M2. The processing times in hours are as follows.Find the sequencefor 5 jobs that will minimize total elapsed time .also find idle time& total elapsed time. Job Processing time [ hours ] Machine M1Machine M2 1 5 2 2 1 6 8 9 7 6 3 8 5 10 4
Exponential smoothening is weighted average method.
Standard time accounts for :-
The reorder point is the:
Time study is useful method of measurement for :-
Which type of inventory distribution system requires the use of a predetermined inventory list?
The inventory of medical and surgical supplies can represent up to what percentage of a facility's operating budget?
What factors affect the status of PPC department in the company for achieving informal status?
The 'G' group of GOLF analysis involves moderate delivery time and availability of credit usually in the range of 30 to 60 days.
Production output in night shift is :-
Transit time for manufactured items should be considered only when it is insignificant.
Among different types of costs associated with inventory, the opportunity cost of the investment tied up in inventory is a(n) ________.
In CPM, use of dummy activities is much essential .
Curve fitting method of statistical forecasting uses curve line approach.
Generally for ________ flow system, Heuristic method is preferred.
DEFINE WEIGHT?
The administrative lead time e.g. time involved in processing theorder, which may be in periodical review system including the perioduntil next review is called ________ lead time.
Long termed forecasts are for the period of :-
If efficiency is more, the manufacturing time required for completion of job would be generally :-
Which of the following is not a necessary requirement of a requisition
Under economic-order-quantity decision model, it is assumed that ________.
Material control function embraces a following techniques :-
An effective case cart system requires:
Stores issue order for an item is prepared as soon as the route sheet is ready.
In replenishment system, the type of ordering is either according to "stock level" or "pre-fixed time scale".
The make-or-buy decision is not related with profit of the factory.
Job production requires ________ capital investment.
The tooling data is prepared in respect of following measuring instruments :-
Of all the work measurement techniques the most widely used techniques is________.
Proper Production Planning and Control can reduce cost in :-
Subsidiary orders include :-
________items should be excluded from ABC Analysis.
Overtime can be avoided in many ways and they are :-
DISADVANTAGE OF STANDARDIZED RECEPI
Which of the following is not an assumption for the EOQ model?
Move orders, released for material movement from stores to first work center are used for following types of organizations :-
The software for CPA would require the following parameters:-
C type items would never be vital under VED analysis.
Progressing is only a substitute for poor planning.
In check list approach, ________ rating indicates that existing PPC system requires some major improvements in indicated areas.
Increase in inventory carrying cost increases EOQ.
Smoothing performs following activities:-
________ analysis mainly helps to identify non-existing items for whichstore keeps bin cards, wastes computer memory or wastes computerstationary while preparing stores ledger.
Just-in-time distribution systems are also known as:
The variable costs per unit of holding an item in inventory for a specific period of time.
If more variety is to be manufactured, the manufacturing facilities would have to be :-
________ is the sum of set up time and run time.
Negative value of critical ratio :-
Given the following data :- procurement cost per order = Rs 30 ;frequency of ordering per year =4 ; number of suppliers = 3 . Form theabove data, total procurement cost would be Rs ________.
The assignment method is also called as :-
Sequencing helps management to determine the most economical job sequence the one that consumes minimum :-
Given a decision for designing a line layout, major problem issubdividing a work so that smooth flow can result. The subdivisionprocess is called :-
Responsibility of smooth flow of work through different work centers or departments of company rests with :-
WHAT U HAVE TO UNDERSTAND PORTION COST?
Weaknesses of PPC department can be studied on following grounds :-
The minimum requirements for application software for line balancing are as follows :-
________ are grouped so that their total time is preferably equal to or little lesser than the time available each work station.
The ROI of the company can be increased by :-
What is EOQ?
Which of the following is not an element of a distribution system?
The ideal order quantity a company should purchase for its inventory given a cost set of production, demand rate, and other variables is known as:
Moving average method lags behind the latest trend.
In PERT, use of dummy activities is not much essential.
If actual demand far exceeds forecast, it will result into :-
The main characteristics of mass and flow production are :-
As the quantity increases, the procurement cost :-
PERT terminology uses words like :-
HML Analysis helps to :-
The sourcing of vendors in case of 'B' type of items is :-
To keep facilities busy, waiting time due to non-availability of work should be kept at :-
YIELD IN CULINARY TERMS REFERS?
In order to complete a project on time, each critical activity need not be completed in time.
Price orientation
Supplies should never be stored
LOB is a manual planning and scheduling technique similar in nature to MRP [Material Resource Planning].
Which area is the first to accept the responsibility for all supplies in the facility
Purchase department must keep PPC informed regarding lead time of different items specially where lead times are extended.
In a mass production assembly shop following work measurement techniques are used :-
Total storage cost = ?
The LOB technique is made more accurate and fast by using ________.
In ABC analysis, the classification is based on :-
As per a study on materials management practices, a typical firm spendsalmost half of its rupee sales on goods purchased from vendors.
Using the basic EOQ model, if the ordering cost triples, then the new order quantity will
Random fluctuation is addition of cyclical fluctuation and seasonal fluctuation.
In an organization, poor material handling system may result in the following :-
Some of significant characteristics of fixed order quantity system under replenishment systems are as follows :-
Ordering of raw material is based on :-
If number of work stations is 8 and work content of all stations is 32 , the cycle time would be ________.
Inventory management technique for determining an item’s optimal order size, which is the size that minimizes the total of its order costs and carrying costs.
Overlapping of operations helps in compressing manufacturing time.
The data in respect of spindle nose pertains to :-
LOB has advantage that it is more ________ oriented than MRP.
Among different types of costs associated with inventory, the costs of obtaining purchase approvals are ________.
Heuristics approach gave very good results when Wester and Kilbridge applied it to ________ assembly line.
Line staff can assist PPC by manufacturing some of their needs in theirown shops rather than making PPC to tool room or purchase.
Process plan is the process of establishing the ________ and mosteconomical path that each part is to follow from raw material stage tofinished product stage.
What shall be the consequence of acceptance of frequent rush orders by sales department?
Earliest possible occurrence time [ I.e. stray time ] of activity [ies ] emanating from the
A company where different personnel give conflicting delivery promises need to improve its scheduling and processing function.
Bar-coding of an instrument sets and integral part of:
The ordering cost per order is $400, and the carrying cost per unit is $10. What is the optimal order size considering an annual demand of 2000 units?
The batch production requires ________ capital investment as compared to job production.
WHAT A ADVANTAGE STANDARDIZE YIELD?
Work sampling is ________
The LOB technique is most appropriate for assembly operations involving number of distinct components.
The two basic questions in inventory management are
Scheduling can be considered as a process of :-
Good quality and ________are the two main requirements to secure maximum business from a customer.
Being capable to adjust their production facilities shortly just afterchange in demand for products and without incurring heavy expenses,greater flexibility in production is provided by ________.
A simple but labor intensive system is the:
While communicating to customer on delays in delivery following information should be given :-
Because of uncertainty of activity timings, PERT acquired a shape of ________ model.
In replenishment system, the fixed order quantity system is also called by following names :-
Mass & flow production and process production are categorized under :-
Buying for C quantities should be made in ________ quantities .
Methods for recording actual progress of work for shop orders are :-
A type items are always vital under VED analysis.
Forecasting is function of ________.
At any level of inventory, the total ordering cost and and total carrying cost are always equal.
The effectiveness of sequencing model technique ________ if the company has backlog of
Inspection operations is a part of process plan for a part.
Keeping available time per day constant, if the desired production rateper day is to be doubled ,cycle time will be reduced by :-
Which of the following is not considered a specialty cart?
In precedence diagram the length of arrow has very high degree of significance.
The assignment algorithm was developed by a Hungarian mathematician named :-
Random fluctuation is considered for deciding ________.
Which of the following formula is used to compute the annual carrying cost?
PERT is suitable in defense projects and R&D where activity times can not be really predicted.
The non-mathematical rationale of the assignment method is one of minimizing opportunity costs.
The cost involved in subcontracting some of the operations of item outside the home plant is called :-
Work measurement is responsibility of :-
Labour efficiency depends upon ________
Activity R can not start unless activities P & Q are completed .And activity S can not start unless activity Q is over [ I.e. activityP may not be even over ]. Activity R is therefore succedding toactivity P & Q while activity S is succeeding to activity :-
To operate fixed order quantity system, following parameters are required to be fixed:-
WHAT A FORMULA PORTION SIZE?
To keep up this site, we need your assistance. A little gift will help us alot.
Donate- The more you give the more you receive.
Related SubjectThe Supply Chain
Retail Merchandising
Procurement
Logistics
Food Service Management
Retail Management
Property Management System
Consumer and Producer
Audio and Video Arts Technology
Gender and Society
Basic Microeconomics
Audio and Video Production
Avian Flu Risks in Focus
Whooping Cough Outbreak in the United States
Configuration Management
Targeted Individuals
Theories of Crime Causation
Programmable Logic Controller
Management Information Systems
Diabetes Education Month
Medical Office Administration
Hospitality Management
Emergency and Disaster Management
Business Administration
Strategy Management and Acquisition
Risk Management
Real Estate Appraisal and Property Management
Investment and Portfolio Management
Credit and Collection
Animation Project
Advanced Database Management Systems
The Economics of Airline Class
Supply and Demand
Introduction to inflation
The Dollar and Inflation
Economics
Retail Sales Surge in October
Avalanche Studies
Management Accounting
Social Media Specialist
Engineering
Quantitative Methods
Numerical Methods
Mobile Application Design and Development 2
Modeling and Simulation
Calculus
Algorithms and Complexity
Cybertruck Technology
Supersonic Air Travel
Germany Energy Policy
Apple M4 Macs
Office Assistant
Maintenance Technology
Management
Health Care Office Manager
Fast Track
Computer Numerical Control
Computer-Aided Design
Administrative Assistant
Public Finance
Computer Aided Drawing
Investment Strategies: Palantir Generational Stock
United States Markets Surge
Sterile Processing and Distribution
Operating System Functions
Project Management
Shopee Cashback Voucher
Temu $0 Shipping Fee
Amazon 75% Off Discounts